Skip to main contentIndustry Solutions
Fleet tracking and operations intelligence for Indian enterprise and government.
IndTrack is one platform: live GPS, alerts, reports, and compliance-ready hardware. Use the sections below to match your operation - logistics, public programmes, schools, emergency fleets, or AIS-140 - without jumping through a dozen separate pages.
Audit evidence is manual. Temperature registers filled by hand are the weakest document in an FSSAI or customer audit, and everyone in the room knows it.Claims cannot be settled with data. Without a timestamped, tamper-evident record, spoilage disputes are settled by whoever argues hardest.Mineral carriers - mine, quarry, cement & steelMining & mineral transport
Mineral and quarry carriers are where the losses hide: unrecorded tipper trips, weighbridge mismatches, and diversions on routes nobody is watching after dark. The same trip-count and weighment model is used on cement and steel haulage.
You pay per trip or per tonne, but the trip count in your system and the trip count on the ground rarely agree. Weighbridge slips are reconciled manually days later, contractors dispute deductions, and by the time a pattern is visible the quarter has closed.
- Trip counts are self-reported. Contractor trip sheets are the source of truth, so billing disputes are argued from memory instead of evidence.
- Weighment and movement live in separate systems. The weighbridge knows tonnage, the GPS knows position, and nothing joins them into a single trip record.
- Diversion on short hauls goes unseen. A ten-kilometre route leaves little room for a dashboard refresh to catch a detour to an unauthorised stockyard.
- Turnaround time is a guess. Queue time at the mine, at the weighbridge, and at the plant gate is invisible, so idle fleet gets solved by adding vehicles.
- The control room and the depot do not share a picture. Radio and phone calls close the gap that the tracking screen should have closed first.
- Route discipline is argued after the complaint. A missed trip or a corridor break is reconstructed from memory, not from a time-stamped service record.
- AIS-140 is treated as the whole system. Fitment and state-backend reporting are necessary. They are not a control-centre workflow for service delivery.
- Leadership sees totals, not services. On-road percentage exists. The individual service that failed this morning does not.
Transport department / STA data exchangeState backend solution
Public transport programmes fail in the last mile between the vehicle and the state system. IndTrack treats state-backend connectivity, protocol conformance, and operational handover as part of the programme, alongside the control-room view the department will actually use.
Devices are fitted and the vendor demo looks fine. Then the state backend rejects packets, IMEIs never appear on the department console, or reporting stops after a SIM change - and the programme is treated as “live” on paper only.
- Fitment is declared complete before the backend accepts data. A fitted VLTD that the state system cannot see is not a commissioned vehicle.
- Protocol and certificate details surface too late. Packet format, authentication, and test-report references become a project after buses are already in service.
- Silence has no owner. When a unit stops reporting, the department, the operator, and the vendor each wait for the other to notice.
- The operational console is a different system. Statutory reporting and the control-room view are built separately, so neither is complete.
Panchayat Raj & road engineering departmentsRural roads & visual evidence
Road engineering and Panchayat Raj programmes need a map of what exists on the ground, not a spreadsheet of what was sanctioned. IndTrack supports geo-coding of rural roads and visual evidence capture so inspection, measurement, and scheme review share one record.
The sanctioned road and the road that was built are often two different geometries. Photographs live on a phone. Measurements live in a register. When a review asks what was completed at a chainage, the answer is assembled after the visit, not captured at it.
- The alignment is not on a map the department owns. Rural roads are described in text and village names. Inspectors cannot drop a pin on the same geometry the sanction used.
- Visual evidence is not tied to a location. Site photographs have no chainage, no timestamp that survives transfer, and no link to the work item they were meant to prove.
- Mobile capture and web review are separate projects. Field staff take photos; the office cannot filter, reject, or replay them against the road without another tool.
- Scheme progress is a compiled statement. Block and district totals are typed up. They are not rolled up from geo-tagged records.
RWSS / PHED - pipelines, assets, scheme mappingRural water & sanitation
Rural water supply and sanitation programmes need assets on a map against the state scheme that paid for them. IndTrack supports geo-tagged mapping of pipelines, structures, and field assets so a scheme review starts from location, not from a compiled statement.
The scheme list says a habitations is covered. The ground has a tank, a stretch of pipeline, and a gap nobody mapped. Photographs of the asset are not on the same record as the scheme code, so a review cannot ask “show me this sanction on the map.”
- Assets live in a register, not on a geometry. Pipelines, ESR/GSR, standposts, and toilets are counted. They are not drawn or pinned against the habitation they serve.
- Scheme codes and field truth do not join. A state scheme identifier exists in the office. The photograph from the village does not carry it.
- Coverage is a compiled claim. Habitation coverage is typed up for the review meeting. It is not rolled up from tagged assets.
- Maintenance has no map. When a line fails, the crew inherits a description, not a geo-tagged alignment and the last inspection.
Municipal corporation - garbage and sanitation vehiclesMunicipal waste & sanitation fleet
Municipal corporations are judged on whether the garbage vehicle reached the ward, not on whether a tracker was fitted. IndTrack monitors collection and sanitation fleets so the control room can see route completion, missed beats, and idle time against the ward plan.
Complaints arrive by ward. The fleet register says every vehicle went out. There is no shared record of which beat was actually run, which vehicle sat in the shed, and which route was shortened before the colony that files the most complaints.
- Attendance is not the same as service. A vehicle leaving the depot is counted as a served ward. The beat itself is not.
- Missed colonies have no timestamp. The complaint is the first signal. There is no geofence or route-completion record to check first.
- Contractors and own fleet report differently. Outsourced collection and municipal vehicles do not sit on one control-room picture.
- Fuel and idle time have no ward context. A vehicle that idled for two hours and a vehicle that finished its beat look the same in a simple GPS log.
Response quality is not reviewable. There is no chronological incident record, so service quality review is anecdotal.Availability status is stale. Which units are free, en route, or at hospital is tracked on a whiteboard rather than in the system.